Another production hall (Hall B1) with an area of 2000 m 2 is constructed, where the SMT line is being built and where LED modules are produced under sterile conditions. The construction of the hall allows for the integration of all production processes – plastic processing, steel processing, LED module production, assembly process, quality control and delivery logistics – in one place.